12.12.2013

Googlizing the AEC Industry

IPD-BIM and SMART Culture Launches AEC Industry to New Levels

I recently posted an article "Googlizing the AEC Industry" on our NoSilos.com site outlining the basis of a new series of live seminar and workshop events to be held in 2014 and 2015. In keeping with our goal of breaking down silos of information and operation within companies and project, we are offering a full two-year training effort called "The Smart Built Culture" to transform those who attend this series. There will be other webinar and free website information and presentations to inform our readership about these resources and presentations so, even if you can't make the live events, you will be able to get some of the benefits of our research and experience over the past ten years in this emerging business model.

7.23.2013

Is 57% waste real in delivery of projects in the Built Environment?

What is the highest portion of waste in construction projects?
It appears that rework tops the list. The data show that rework often has more than one cause. A recent CII study called "A Guide to Construction Rework Reduction" reveals that the biggest contributor to rework, at 25.4%, is scheduling, followed by issues related to materials and equipment (19%), design and engineering (14.6%) and instruction/monitoring (14.5%). Cutting costs too much can also drive rework. To save money, for example, some architects and engineers use old designs or templates for new projects, and those designs may have problems that were fixed on a previous job but remain in the original design and are passed along to a new one.


At the beginning of this year a conversation began between myself and collaboration principles of NoSilos.com. The reports from the Building SMART Alliance and the Construction Institute and others have been purporting A huge percentage of waste in our industry. While I cringe at the huge numbers, the reality is a lot of that number is infrastructure costs which are inflated due to the litigious nature of our business. Examples such as insurance, performance bonding and financing directly increase the cost due to the risky nature of the current methods we use to deliver Built Environment  projects. So eliminating these excessive costs will be difficult until lenders, insurers and risk assessment folks change their policies to favor less risky arrangements.

That said, the Cll study cited in the ENR article gives us a glimpse behind the numbers from yet another perspective. The study points out that rework, aka failure that manifests itself at the tail end of a project, is spawned by many different failure mechanisms. Bad schedules, materials, equipment, design, execution, supervision etc. etc. account for rework BUT most rework arises from more than one failure mechanism. Further, rework is merely the visible tip of the iceberg. The real failure points lie submerged and ignored.

If necessity is the mother of invention then crisis is the father of failure. And we see the father of failure sowing wild oats all over! And let us count the ways:
  •  RFI's
  • Energy
  • Re-work
  • Waste removal
  • Poor site logistics
  • Over priced construction materials
  • Over priced construction equipment
  • Poor delivery coordination
  • and more, more, more.....
At NoSilos.com we have a metric we use called ROF or Return on Failure. Sort of like the Return on Investment metric known in the financial world, but in reverse. The value of failure compounded over time creates its own wave of increased cascade of failure. 

So how much can be reduced. Past experience shows a possible reduction on privately funded projects of at least 10% and more likely around 15% when we used a modestly integrated design and delivery process not even close to true IPD process. The key to these numbers was a combination of great communication, clear goals and some judicious use of technology to help make the process a bit easier. 

The bottom line, from our perspective, is that waste and inefficiency are known realities by key stakeholders in every sector of the economy regardless of their willingness to admit to the presence of the waste. We bring solutions to identify the differences between uncontrollable and controllable waste. What our clients do to reduce those costs is up to them. There is a vast opportunity for every company to reduce their ROF and increase their ROI to levels not seen before. 


6.17.2013

Lean Startups and the Flow of Value-A lesson for the AECO Sector

Dave West recently wrote an article in ProjectsAtWork.com's June issue  that I immediately identified with. In fact he almost writes a parallel post to one of my original posts which is also one of the all-time favorite posts here on this blog. BIM & XPM-A Made Marriage.

Dave is currently the Chief Product Officer at Tasktop and one of the foremost industry experts on software development and deployment. He has helped advance many modern software development processes, including the Unified process and Agile methods. As such, he knows of what he talks and it is a strong validation of the work I discovered somewhat by accident and happy circumstances over ten years ago.
Please read Dave's article here

Dave's mention of the Lean Startup movement, that is going through companies right now lead him to some interesting conclusions. As a mentor at our local Gangplank chapter in Tucson and having been through several Lean Launchpad  Startup workshops, I can attest to the parallels which Dave highlights. For the real focus on the Lean Launchpad is creating value and validation of a new idea using the minimum of effort to seek the greatest return. In a Lean Launchpad we don't go into big elaborate tests, but use simple tests to determine if an idea has merit in the marketplace. For me that was natural. I have been doing that in design practice for quite a while. Tweaking the context was easy for me to see how focusing on creating the greatest value using the least expensive means possible gave way to determine where the maximum effort should be spent as an idea matured and became validated.

How did all this resonate with me? I started using a variation of XPM and Agile back about 10 years ago in the design profession of architecture. The close parallels of SW development and working in the built environment design are quite scary. For that reason, and that it focuses on the value stream of information, the above rationale delivers very good results.

On my early journeys in this endeavor to find a better way to practice design I looked for ideas which would bring the design process together more efficiently. Since I'm not a purist on either the lean or agile side I just looked for what worked well and could be repeated over and over with consistent results. Creating a flow of information which delivered the value needed for timely decisions became our mantra. It reduced rework, it focused on the issue(s) at hand and set all others aside and above all was guided by the principle of keeping the end goal in mind.

Often, the project's end goal was modified along the way due to inconsistencies in assigning value in the beginning. But that is to be expected, since not all the value is known before a project starts. Discovering that new areas of value harvesting made more sense than staying with original ideas we were able to keep the project expectations in line and the Owner happy. More times than not, the final results were better than anyone would have imagined going into the project.

Who was responsible for delivery, everyone. If someone working on the project did not see it was their project to deliver value, they often were removed or isolated out to minimize their damage to the rest of the producing team.

As you can see, adaptability, collaboration, transparency, autonomy and focus on value were key components in our success.

Always remember "Collaboration is the Glue of Success"

NoSilos.com
Collaborative Construction Blog

This article is a continuation of conversations about how delivery of professional services in the Built Environment can change the way business is done. This article focuses on the change in focus from functional activity to delivery of value in every action and the need for all participants to own their part of the project delivery. It is a continuing String of thought with connections to project management, project delivery methods, change management and the continuing evolution of business delivery in our marketplace. 

11.14.2012

Chaos & Change - Part 5 -HR. Part of the problem...

I admit it. I have a permanent negative bias for HR departments. They should be part of the solution, but they aren't. They are controlling where they need to be open. They are obstructionists where they should be enabling. They are restrictive where they should be expansive.

This post is one of a continuing series on the factors I see contributing to the debilitating chaos and waste in our working lives, no matter if in the private, public or non-profit worlds. Waste is a terrible thing to endure. If our organizations are to be effective in the 21st century, pervasive change needs to occur. For the start of the series see "Part 1-Chaos and Failure are Brothers" and continue through the series. I think you will find something which hits home for you and your organization. At that point it is up to you to start affecting the change needed in your world-take responsibility, move ahead.

In a recent blog post by Mike Cook entitled, "Is SHRM Fiddling While HR Goes Down in Flames?" he asks some really good questions about the current mindset of HR departments.
"In the course of my work I have many occasions to address local gatherings of HR professionals and am confounded by the lack of urgency I see towards the development of what seems to me the number one issue facing organizations, significantly improved capabilities in the acquisition, development and retention of the necessary talent for the business they are a part of."
I agree wholeheartedly with Mike. What is going on with HR in general? Have they been asleep in their little cocoons for the last 5 years? Have they even seen the transformations taking place in their companies which reward exploration, innovation and multidisciplinary involvement? Apparently not. While their house is burning, they continue to fiddle the tunes of the 1990's and have seemingly missed the 21st century transformations since 2006.

The chaos they contribute to an organization adds to the "Stupid Index" (my interpretation) of their companies they are supposed to be serving. Instead of contributing, they are distracting and compartmentalizing the efforts of their constituents they are called to serve. If I sound like I'm on a ran, I guess I am. I loathe the continued waste on the scale HR groups usually contribute to a company, when they could be a strategic contributor, rather than a tactical obstacle. Apparently those who know this subject much better than I and have recently reported their findings which supports the real life experiences I've had with HR groups. Both the Boston Consulting group and McKinsey are respected companies who measure their findings and support their positions with hard research.

When they find little or no change in HR departments over the past five years in meeting the changing market conditions of the organizations they supposedly serve, it supports the continuing mountain of evidence building that today's organizations are in dire need to shed old and ineffective action and thinking and replace it with more agile and responsive organizations. Permanent Change Management is needed, now.

My thanks to Mike for writing such a revealing and on point post. Hopefully, some CEOs and HR directors will awaken to the burning timbers around them, get the fire out and rebuild a new house which is really a responsive representative of their constituent stakeholders.

This is a continuing series of articles as a Connection about Chaos and Change Management in the workplace. Other ideas here include Lean, Agile and Management 2.0 management theory as applied to complex or wicked problems. 

8.24.2012

Chaos and Change - Part 3 - Lean, Agile and Mgt2.0 Can Succeed

This is the third article in a series about Chaos and Change. How they change our working worlds and how we can gain come control of the chaos. The previous installment was titled Chaos and Change are Brothers - Part 2  I suggest you might want to go back and catch it as well. 

The following is a reply I posted on Fierce Healthcare's discussion area. The site is one challenging healthcare folks to stay up with the latest developments in their fields. I came across Susan D, Hall's post in a LinkedIn Group and thought it interesting. While all of you know I'm a big supporter of better management and highly collaborative frameworks for companies, I thought it appropriate to clear the air about change initiatives and their chances to survive and make have some permanent change as a result. The following is my comment on Susan's blog post you can read here entitled, Lean leadership in healthcare: What does it take? Of course my comment there is posted here, but please read Susan's work as well.

Your Brains Work Best When They Can Turn from Failure to Success

Susan,
As an evangelist for better business principles which are more lean, more agile and responsive both internally and externally, I applaud your efforts in healthcare. Unfortunately, the cards are stacked against you. J, Kotter in 1995, Turner and Crawford, 1988 and Prosci, 2005 all indicate that only 30% (at best) of projects introducing change in organizations have reported any real measurable change. If you look at the flip side, that's 70% failure. Now I'm

7.26.2012

Muda Walks in September: Guest Article

Hi everyone,
I've been rushing about the last couple of weeks and part of that was to broaden the writer base for Strings, Connections and Links. One of the really interesting and knowledgeable folks I found was Dennis Sowards. Dennis has been working as a lean practitioner for quite a while now and he has what I think is one of the more refreshing viewpoints on lean. I would encourage you to take him up on his offer to conduct a Muda (that's waste for those not in the know) Walk.

Here's Dennis' invitation. Oh yes, you don't have a lot of time, so sign up by Aug 28th. Take it away Dennis.


Muda Walk 2012
Dennis Sowards
How to improve operations? There are thousands of answers to this question and more are developed every day. One simple way to improve is to follow the Lean approach of “Go & See.” Masaaki Imai, a leading expert on Lean techniques, says that in companies

6.01.2012

7+ Reasons PM's Don't Improve Efficiency or Productivity

Many of you know I subscribe to the art of stealing and transforming ideas to get new results or perspectives around difficult problems. It's just an axiom of our world, 'nothing is new under the sun.' Did you know they had vending machines in Pompeii? Amazing!

In a recent article on Projects@Work there was an article closely titled to this entry, but it related to CEO's. It was written by Mike Beard who is a pro at Project Management. Mike was writing about the folks in the C-Suite, but let's take a minute and step back to take a closer look at the everyday activities of project leaders and managers. I would contend that Mike's seven reasons falls squarely on the shoulders of just about every person who managed a project or held some kind of management responsibility. At sometime all of us have been party to one or more of these seven reasons. It's not an indictment, it's just the way we are as humans. It is also not an excuse for the behavior to continue. I would hope all of us are working to become better practitioners in our chosen fields and have some ability to look at ourselves candidly to measure how well we perform and act. So let's look at Mikes' Seven Reasons quickly and see how we measure up. Oh and I've added a bonus reason at the end for you.

1. We have met the enemy and he is us: (my paraphrase). Yup, I'm my own worst